Presently we have a Major Lift Irrigation scheme on hand to irrigate about 7000 hectares of agricultural land in Satara District of Maharashtra. The following are the details of the same.
- Survey of gross command area of 7000 hectares, preparations of designs, drawings of complete project.
- Construction of jack well, Intake well etc.,
- Construction of Pump house, fixing the pumping systems of VT pumps of 900 HP four numbers.
- Laying of rising main of 1000 mm dia M.S Pipe line with cement coating on both outside and inside for a length of 4000 meters.
- Second stage Pumping system with VT Pumps of 550 HP four numbers.
- Construction of Delivery chambers of requisite dimensions for Distribution Lines.
- Distribution mains of RCC Pipes, PVC Pipes, PSC Pipes for a total length of 150000 meters.
- The pump houses will be provided with Supervisory Control And Data Acquisition (SCADA)
The current status of the project is:
Survey work is under progress and all the required materials are being planned for procurement.